SAP Work manager implementation for a major water & power producer in Qatar
The Client is an independent Water and Power producer, established in 2015, as part of Qatar’s biggest power and water projects. They own one of the largest desalination and power generation plants in the region with a daily production capacity of 2520 Megawatt of power and 136.5 million gallons of draining water per day. They apply state-of-the-art technologies that conserve the environment and ensure highest standards in water production and electricity generation.
Kaar understands that the client is looking forward to implementing the SAP work manager functionality on their existing SAP S/4 HANA System
Share this article
Written by : Abisekh V
Abisekh is the analyst of @ KaarTech Branding who deals with the engineering of features and deals with functionalities for solving transformation-related problems.